Need more information? Let us call you

T.B.S. Mechanical & Electrical Design & Build Ltd

263 Alcester Rd. South, Kings Heath, Birmingham B14 6DT

t: 0121 693 5575  f: 0121 693 5556
e: office@tbsmech.co.uk

 

Design & Installation

 
Please click on the small images to view more pictures.
Click on the text links to view a different case study.
 

Forest Holidays Forest of Dean Water supply infrastructure

TBS undertook a major mechanical services infrastructure design & build project to provide potable boosted water to the site. This 60,000 litre two compartment water storage tank together with booster pump equipment and some 4 kilometers of underground fusion welded distribution pipework systems supply potable water to over 70 high quality holiday lodges within the forest.